Updated on 7.9.2009
 
Progress on Science Lab project :
 
The Science Laboratory project executed and part financed by ex-students ( and partly by Johnson & Johnson Limited ) have been handed over to School for starting the classes and holding experiments from 20.7.2009. The installation of False ceiling, the fans, the lighting, the  aluminium windows and exhaust fans are completed. The new Lab tables topped with Granite has been completed. The tablet chairs with seating capacity of 60 students have been procured and have been been positioned. The plumbing work of water supply lines and drainage lines with new wash basins, have been completed. The Chemistry table re-agent racks have been assembled. The gas line for chemistry tables has been completed. The window blinds are being planned. There is also a proposal of having LCD projector and roller screen for audio-visual presentation. The painting work will be taken up after the monsoon.

sciencelabceilingview.jpg
Science Lab celing view

sciencelabwindowandgranitetables.jpg
Alumninium sliding window and granite table

 
Updated on 2.9.2009
 
Renovation of Science Laboratory
 
The very first School project where ex-students are involved in, after a lapse of twenty years!
The Project Committee of BES consisting of ex-students and teaching staff of School undertake to renovate the Science Laboratory. In the first stage, the aluminium perforated false ceiling with glass wool insulation, the sliding alumnium windows, a ventilation system consting of exhaust fans, the ceiling fans, tube lighting and electricals got initiated. The work is in full swing and the completion date is 14.6.2009, so that the Lab is ready to function from 15.6.2009 when School reopens.
In the second stage, the furniture like Lab tables, the plumbing and gas lines have been replaced.
The third stage consist of replacing the out-dated Lab equipements.

sciencelab2.jpg
A section of Science Lab before renovation

 
Uploaded on 14.5.2009
 
1. The repair, plastering and leak proofing of the entire School Buildings were taken up by Managing Committee around last week of April. Presently the work is in full swing and is supervised by Architectural and Structural Consultant. The work is likely to be completed before 15.6.2009 when the School reopens.

Following School projects were listed during the Platinum Jubilee celebrations in October 2008.

 

1.     The infrastructure at present is 75 years old & needs an Architect to assess the life of the building structure and take up necessary repair works to increase the life of the buildings.

 

2.     Plastering, painting inside and outside of school buildings.

 

3.     Complete renovation of the Science Laboratory.

 

4.     To upgrade present Computer Lab.

 

5.     To upgrade Library room with furniture and books necessary for school children and teachers.

 

6.     To replace all old benches of class rooms, blackboards, and upgrade staff room.

 

7.     To upgrade, beautify, and modernise the Pre-Primary Section.

 

8.     To provide some sports facilities like basket ball court, table tennis room etc.

 

9.     To beautify compound and the entrance of school.

 

10. To  convert  the  existing  Hall in  primary  building  with  good  sound  system and air conditioning.

 

11. To  cover  up  open   space   between   the  two   buildings   with shades (foldable)   as   per   BMC’s  rule. Similarly   cover   up  2  terraces above two  buildings with shades.

 

...............................................................................................